CLD Consulting Engineers, Inc.



Updates 







  Home




  About CLD




  Services




  News & Events




  Project Updates




  Portfolio




  Careers




  Resources




  Contact Us





Search this site










Dover Transportation Enhancements 

General
Information
Project 1
Durham Road Shoulders
Project 2
Back River Road Signal
Project 3
Dover Point Road Shoulders & City-Wide Bicycle Amenities
Project 4
Knox Marsh Road Sidewalks
Project 5
New Rochester Road Sidewalks
Project 6
Central Avenue Signal Coordination
Project 7
Downtown Transit Loop
Project 8
Newington Branch RR Bike/Ped Trail

Project 5 - New Rochester Road Sidewalks

Located on New Rochester Road, beginning at Weeks' Crossing and continuing on the east side of the street for a distance of approximately 3500 ft. to the corner of NH Rte 108 and Long Hill Road, the project entails the construction of a 5 ft. wide paved sidewalk. The sidewalk will serve to and through an area of moderately populated single family homes, multifamily apartment structures, office and commercial uses, including banks, restaurants, and convenience and hard goods stores.

This section of major arterial roadway is located in the northern high traffic section of the urban compact and does not currently have a pedestrian facility. Pedestrians are forced to walk along the edge of the traveled way or on partial paths that have evolved through the years. A new sidewalk will enable the neighborhoods' residents to use walking as a safe and alternative form of transportation to and from businesses along Central Avenue and the Hospital.

The new sidewalk will promote a safe pedestrian route for both adults and children bound for these destinations and for transit users bound for local bus stops along New Rochester Road and Central Avenue. The new sidewalk will connect with the sidewalks completed as part of the Weeks' Crossing project as well as those associated with recent commercial development along New Rochester Road.


Project Status Update

  • Design is scheduled to begin in Spring of 2005.
  • Construction is expected in 2006.
For further information, contact JoAnn L. Fryer, PE, Program Manager, at jlf@cldengineers.com.
 
 


Home | About CLD | Services | News | Updates | Portfolio | Careers | Resources | Contact Us



CLD Consulting Engineers, Inc.
540 Commercial St., Manchester, NH 03101
p: 603.668.8223   f: 603.668.8802
e: cld@cldengineers.com   w: www.cldengineers.com



© CLD Consulting Engineers, Inc., 2001.  All rights reserved.
Produced and powered by: Sitesurfer Publishing LLC